Whew! We were tasked with the removal and installation of Hazard and Tariff signs all over Raleigh Durham Airport. 300! Likely the biggest job we've ever attempted. Took a week of working in 4-hour shifts at the airport with TSA escorts to get around. Acrylic with beveled edges.
[caption id="attachment_404" align="alignleft" width="300"]
300 signs removed and installed in one week[/caption]